Blue Line Platform Paver Replacement, Minneapolis, MN

Transit

Marcie Weslock was the project manager and lead civil engineer on the Blue Line Paver Replacement project for Metro Transit. The original design on the platforms includes pavers that have not held up well to the Minnesota winters. The goal of this project was to replace the pavers with fiber reinforced colored concrete. This project was distinctive due to the need to perform the construction over a single shutdown weekend. This required many unique details and readily available materials to ease construction. Construction has taken place on five (5) platforms. Three additional platforms are currently in design and will be built in 2015.

Location:             Multiple Locations, Minneapolis, Bloomington, MN

Project Size:       Eight (8) Platform Station Renovations

Élan’s Role:        Project Manager and Lead Civil Engineer